This project involved logistics, craning and transporting a vacuum chamber comprised of three separate
36-1/2 ft x 10 ft ring structures (each weighing 90,000 lbs) and other components, each transported as a heavy-haul, oversize flatbed load.
Legacy prepared a logistics plan for this move, including permits and highway patrol assistance, timing as well as craning the pieces onto and off of the flatbeds.